Home Page › Forums › Chassis › Worm drive axle Reassembly › Reply To: Worm drive axle Reassembly
Here is the completed assembly. I measured the distance with a straight edge and a caliper from the rim of the carrier (where the bearing went on) to the side of the bronze gear to ensure everything was centered. Took measurements a 12,3,6,& 9 o’clock on bot sides and they were within a .001″
Just need to align the holes in the bolts and install the cotter pins and this part is done.
On to the worm gear and the case assembly.”
